Hydroelectric turbine Power of a few KW (pico) or up to 100 kW generators, alternators, EMS (energy management systems)

Reference: K.1.1

LEME Mitigation

Increase of the production by retrofit or replacement of equipments

IEC 1116 (Electromechanical equipment Guide for small installations)

IEC 60034
IEC 1116 (Electromechanical equipment Guide for small installations)

Estimated pay back time short term : 2-4 years, medium term: 4-6 years, long term : 6-8 years (*)

Medium/Long term

Total installed capacity ≤ 100kW per unit installed